What our Customers say about us

Send this page to a friendSend PagePrint this PagePrint

Home > Case Studies > Focal Point Fires

Case Study: Focal Point Fires

Project: Strip out of existing call centre office construction & rebuild including increase in mezzanine floor area. All whilst client operations were retained & left functioning.

Value: 176,000

Duration: 14 weeks

Elements: Mezzanine Floor / Fire rated compartment partitioning / Glazed internal partition with glass doors / Storage wall cupboards / Laminate flooring / Flush plasterboard ceilings with coffered feature / Office desking & seating / Air conditioning / Ventilation / Lighting / Power / Data / Smoke detection / Fire alarms / Smoke detection

Building Envelope: A 15yr old industrial warehouse building of standard construction some 3,000sq.ft (280sq.m.) x two levels.

Photographs from this project are shown below...

Plasterboard coffered ceiling feature gives feeling of space & creativityGlazed partition with feature vinyl filming surrounds unique quality Italian seating imported by Space IndustriesLaminate flooring drops to transfer level with feature lighting to footwellBuilding exterior leads you to believe this to be a factory rather than a high quality call centre environment inside!!
*

Website last updated 19th August 2015