Case Study: Focal Point Fires
Project: Strip out of existing call centre office construction & rebuild including increase in mezzanine floor area. All whilst client operations were retained & left functioning.
Value: £176,000
Duration: 14 weeks
Elements: Mezzanine Floor / Fire rated compartment partitioning / Glazed internal partition with glass doors / Storage wall cupboards / Laminate flooring / Flush plasterboard ceilings with coffered feature / Office desking & seating / Air conditioning / Ventilation / Lighting / Power / Data / Smoke detection / Fire alarms / Smoke detection
Building Envelope: A 15yr old industrial warehouse building of standard construction some 3,000sq.ft (280sq.m.) x two levels.