Case Study: Icemaster / Yara

Project: Emergency repairs and alteration to existing mezzanine floor structures (installed by others) under a condition of 'imminent collapse' due to overloading.

Value: 29,000

Duration: 2 weeks

Elements: Structural steelwork related to engineers calculations and recommendations to 'recover' a failing structure under continuous and heavy load with vibrating machinery.
Works included specialist equipment lifting at a 'long reach' machinery weighing in excess of 2500kg.

Building Envelope: An industrial portal framed and clad warehouse constructed within the last 15 years.

Photographs from this project are shown below...

Steel Plant deck supporting 2.5 Tonne machine manufacturing Dry Ice
*