Case Study: Berthon Boatyard

Project: To strip & re-clad the external elevations (to 8m high) of a waterside office buiding in parallel with an internal office refurbishment whilst client operations are maintained during a phased installation.

Construction site operated under CDM conditions with Space Ind. Ltd acting as Principal Contractor & Planning Supervisors in Lymington, Hampshire.

Value: 380,000

Duration: 26 weeks

Elements: External insulated profiled cladding / Velux windows / Replacement aluminium double glazing / Internal strip out & demolitions / Internal office partitioning with glass doors / Decoration / Carpeting / Lighting / Power / Data / Central heating / Desking / Seating / Joinery / Display media / Glazing filming.

Building Envelope: A 3,900 sq.ft (360sq.m.) steel portal frame multiple steep angle pitched roofed building with steel & timber external cladding.

Photographs from this project are shown below...

External elevations are prepared with access scaffolding prior to recladding worksReception Desk6m long cladding sheets craned into positionOffice Desks & SeatsCurtain wall glazing installed 8m from ground levelHoisting The Cladding Panels
*