Case Study: Sunseeker

Project: Access walkways to service boat build manufacturing lines.

Value: 20,000

Duration: 2 weeks

Elements: Structural steel mezzanine walkway with guardrails and small office.

Building Envelope: Portal frame steel building less than 10 years old.

Photographs from this project are shown below...

Stairs just fitted. Decking lifted onto steelwork ready to start boardingChipboard decking being installed over mezzanine steelworkFire protection to underside being installed. A safety 'Roll Over' load gate to front edge
*