Case Study: Sunseeker

Project: Creation of staff canteen facilities on a two-tier mezzanine floor within a shipyard environment whilst retaining ground floor manufacturing capability.

Value: £185,000

Duration: 10 weeks

Elements: A multi-tier ( 2 floor levels) structural steel mezzanine floor with access stairs and disabled persons lift. Works included provision of fire protection to the underside and construction of protected escape routes. Removal of 10m x 10m shutter door with glazed infill.

Building Envelope: Portal frame steel clad building operating as a boatshed for construction of high value motor yachts.

Photographs from this project are shown below...

Mezzanine decking almost completedStairwell enclosure & canteen furniture - looking down from second to first floor levelsView from stairs to intermediate floor levelCanteen furniture on first floor level with views through glazing where loading door previously positionedSteelwork detail showing a lowered landing area to access through to existing front office floor levelView of Canteen servery constructed in fire resisting partitioning – guardrailing to exposed edgesServery areaPayment till area – see context within standard portal framed building
*