Case Study: Focal Point Fires
Project: Refurbishment & fitting out of a Warehouse for Assembly & Distribution use in Christchurch, Dorset.
Value: £59,000
Duration: 7 weeks
Elements: Epoxy Floor Painting / Pallet Racking / Partitioning / Fire Shutter Doorway / Fire Alarm / Power distribution
Building Envelope: A 15yr old 17,431sq.ft (1,619sq.m) ground floor + 3,873sq.ft (360sq.m.) First Floor Standard Construction Industrial Warehouse.