Case Study: Aspect

Project: Wc Build Project - Hamble, Southampton

Value: 27,000

Duration: 4 weeks

Elements: Blockwork / Wall Ducting / Cubicles / Vanity Units / Plumbing / Non Slip Sheet vinyl & coved skirtings / Wall Tiling / Suspended Ceilings

Photographs from this project are shown below...

Postformed Vanitory top with formed upstand & drop skirt all over base unit with inset sinks & lift off access panelsHigh Pressure bonded laminate WC cubicle with ceramic tiled stud partition & coved welded seam sheet floor vinyl
*