Cleanroom Testing & Validation

Typically upon completion of construction & commissioning of Plant & Clean Room envelope - Space Industries carry out a Validation to the 'As Built' state prior to tendering our final account.

Thereafter either our client or Space Industries at additional cost cover the return to re-validate to the 'At Rest' condition & finally return a third time for the 'Operational' condition.

ISO 14644-3: Methods of evaluation and measurements

Part 3 - Metrology and test methods:

  1. Airborne particle count for classification of the installation and test measurement
  2. Airflow test
  3. Air pressure difference test
  4. Installed filter system leakage test
  5. Flow visualization
  6. Airflow direction test
  7. Temperature test
  8. Humidity test
  9. Recovery test
  10. Containment leak test
*